Triple

T19247096
Position Surface form Disambiguated ID Type / Status
Subject Autovía A-6 E481286 entity
Predicate formsPartOfCorridor P2566 FINISHED
Object Madrid–Galicia corridor NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Madrid–Galicia corridor | Statement: [Autovía A-6, formsPartOfCorridor, Madrid–Galicia corridor]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Madrid–Galicia corridor
Context triple: [Autovía A-6, formsPartOfCorridor, Madrid–Galicia corridor]
  • A. Barcelona–Tarragona corridor
    The Barcelona–Tarragona corridor is a major transportation axis in Catalonia, Spain, linking the metropolitan area of Barcelona with the coastal city of Tarragona through road and rail infrastructure.
  • B. Madrid–Toledo axis
    The Madrid–Toledo axis is a major transport and development corridor in central Spain that links the capital city of Madrid with the historic city of Toledo, passing through intermediate towns such as Aranjuez.
  • C. Madrid–Valencia road
    The Madrid–Valencia road is a major Spanish highway that connects the capital city of Madrid with the Mediterranean port city of Valencia, serving as a key route for both regional and long-distance traffic.
  • D. Madrid–Segovia line
    The Madrid–Segovia line is a Spanish railway route that historically connected Madrid with the city of Segovia across the Sierra de Guadarrama.
  • E. Madrid–Burgos railway line
    The Madrid–Burgos railway line is a major rail route in Spain that historically connected the capital Madrid with the northern city of Burgos, serving both passenger and freight traffic.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Madrid–Galicia corridor
Target entity description: The Madrid–Galicia corridor is a major transport axis in Spain linking the capital Madrid with the northwestern region of Galicia through a network of highways and rail lines.
  • A. Barcelona–Tarragona corridor
    The Barcelona–Tarragona corridor is a major transportation axis in Catalonia, Spain, linking the metropolitan area of Barcelona with the coastal city of Tarragona through road and rail infrastructure.
  • B. Madrid–Toledo axis
    The Madrid–Toledo axis is a major transport and development corridor in central Spain that links the capital city of Madrid with the historic city of Toledo, passing through intermediate towns such as Aranjuez.
  • C. Madrid–Valencia road
    The Madrid–Valencia road is a major Spanish highway that connects the capital city of Madrid with the Mediterranean port city of Valencia, serving as a key route for both regional and long-distance traffic.
  • D. Madrid–Segovia line
    The Madrid–Segovia line is a Spanish railway route that historically connected Madrid with the city of Segovia across the Sierra de Guadarrama.
  • E. Madrid–Burgos railway line
    The Madrid–Burgos railway line is a major rail route in Spain that historically connected the capital Madrid with the northern city of Burgos, serving both passenger and freight traffic.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8e8cd9d1081908a181d02b88b59b8 completed April 10, 2026, 12:10 p.m.
NER Named-entity recognition batch_69e5fb2daacc8190b8af99dee51f238d completed April 20, 2026, 10:08 a.m.
Created at: April 10, 2026, 1:27 p.m.