Triple

T19245294
Position Surface form Disambiguated ID Type / Status
Subject University of Toronto Faculty of Applied Science and Engineering complex E481233 entity
Predicate hasPart P35 FINISHED
Object Pratt Building NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Pratt Building | Statement: [University of Toronto Faculty of Applied Science and Engineering complex, hasPart, Pratt Building]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Pratt Building
Context triple: [University of Toronto Faculty of Applied Science and Engineering complex, hasPart, Pratt Building]
  • A. Leacock Building
    The Leacock Building is a major academic and classroom complex at McGill University’s downtown Montreal campus, housing numerous lecture halls, offices, and social science departments.
  • B. Goodhue Building
    The Goodhue Building is a historic library structure designed by architect Bertram Goodhue, notable for its distinctive architectural style and role as a central public library facility.
  • C. Bayard-Condict Building
    The Bayard-Condict Building is a pioneering early skyscraper in New York City, celebrated for its ornate terra-cotta façade and as the only work there by architect Louis Sullivan.
  • D. Davis Building
    The Davis Building is a facility located on the campus of the University of Texas at Martin (UTM), used for academic and institutional purposes.
  • E. McClurg Building
    The McClurg Building is a historic Chicago commercial structure recognized as a significant example of early skyscraper design by the architectural firm Holabird & Roche.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Pratt Building
Target entity description: The Pratt Building is an academic facility at the University of Toronto that houses engineering teaching and research spaces within the Faculty of Applied Science and Engineering.
  • A. Leacock Building
    The Leacock Building is a major academic and classroom complex at McGill University’s downtown Montreal campus, housing numerous lecture halls, offices, and social science departments.
  • B. Goodhue Building
    The Goodhue Building is a historic library structure designed by architect Bertram Goodhue, notable for its distinctive architectural style and role as a central public library facility.
  • C. Bayard-Condict Building
    The Bayard-Condict Building is a pioneering early skyscraper in New York City, celebrated for its ornate terra-cotta façade and as the only work there by architect Louis Sullivan.
  • D. Davis Building
    The Davis Building is a facility located on the campus of the University of Texas at Martin (UTM), used for academic and institutional purposes.
  • E. McClurg Building
    The McClurg Building is a historic Chicago commercial structure recognized as a significant example of early skyscraper design by the architectural firm Holabird & Roche.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8e8cd9d1081908a181d02b88b59b8 completed April 10, 2026, 12:10 p.m.
NER Named-entity recognition batch_69e5fb2c34e88190a338e5a7ba906425 completed April 20, 2026, 10:08 a.m.
Created at: April 10, 2026, 1:27 p.m.