Triple

T19244889
Position Surface form Disambiguated ID Type / Status
Subject U-OV region E481224 entity
Predicate instanceOf P0 FINISHED
Object transit service area C42172 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: transit service area
Context triple: [U-OV region, instanceOf, transit service area]
  • A. urban service area
    An urban service area is a designated geographic zone within or around a city where public services and infrastructure—such as water, sewer, transportation, and emergency response—are planned, provided, and managed in a coordinated manner.
  • B. transit-oriented development area
    A transit-oriented development area is a compact, walkable, mixed-use urban district planned around high-quality public transportation to reduce car dependence and support sustainable living.
  • C. public transit system
    A public transit system is an organized network of shared transportation services—such as buses, trains, subways, and trams—designed to move large numbers of people efficiently within and between urban and regional areas.
  • D. commuter rail zone
    A commuter rail zone is a designated geographic area used to determine fares, ticketing, and service boundaries for regional passenger rail travel.
  • E. fixed-route transit service
    Fixed-route transit service is a public transportation mode that operates vehicles along predetermined paths with scheduled stops and timetables, regardless of individual passenger requests.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8e8cd9d1081908a181d02b88b59b8 completed April 10, 2026, 12:10 p.m.
Created at: April 10, 2026, 1:27 p.m.