Triple

T19232376
Position Surface form Disambiguated ID Type / Status
Subject E Embarcadero line E480902 entity
Predicate instanceOf P0 FINISHED
Object San Francisco Muni route C22797 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: San Francisco Muni route
Context triple: [E Embarcadero line, instanceOf, San Francisco Muni route]
  • A. San Diego Trolley line
    A San Diego Trolley line is a specific light rail route within the San Diego Metropolitan Transit System that operates along a defined corridor, serving designated stations according to a published schedule.
  • B. San Francisco Muni service application
    A San Francisco Muni service application is a mobile or web-based system that provides real-time transit information, trip planning, service alerts, and fare-related features for riders using San Francisco’s Muni public transportation network.
  • C. AC Transit division
    An AC Transit division is a geographically defined operational facility where the Alameda-Contra Costa Transit District houses, maintains, and dispatches its bus fleet and personnel for service in a specific service area.
  • D. DC Circulator line
    A DC Circulator line is a specific bus route within Washington, D.C.’s Circulator transit system that provides frequent, low-cost service along a defined corridor connecting key neighborhoods and destinations.
  • E. local bus route chosen
    A local bus route is a designated path within a limited geographic area along which buses operate on a regular schedule to transport passengers between specific stops.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8e8ccb8f48190ad420098e74fb1db completed April 10, 2026, 12:10 p.m.
Created at: April 10, 2026, 1:25 p.m.