Triple

T19208294
Position Surface form Disambiguated ID Type / Status
Subject Ebbw Vale E480292 entity
Predicate river P165 FINISHED
Object Ebbw River NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Ebbw River | Statement: [Ebbw Vale, river, Ebbw River]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Ebbw River
Context triple: [Ebbw Vale, river, Ebbw River]
  • A. River Ebbw chosen
    River Ebbw is a river in south-east Wales that flows through former industrial valleys of Gwent before joining the River Usk near Newport.
  • B. River Dwyryd
    River Dwyryd is a river in Gwynedd, Wales, that flows through Snowdonia to reach the estuary near Porthmadog on the west coast.
  • C. Rhymney River
    The Rhymney River is a river in South Wales that flows through the city of Cardiff before reaching the Bristol Channel.
  • D. River Honddu
    River Honddu is a small river in Powys, Wales, known for flowing through the Brecon Beacons area before joining the River Monnow.
  • E. Ogmore River
    The Ogmore River is a river in South Wales that flows through the Vale of Glamorgan to the Bristol Channel near the village of Ogmore-by-Sea.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8e8cb8c348190b52075823911c869 completed April 10, 2026, 12:10 p.m.
NER Named-entity recognition batch_69e5f9a000188190afb762ea24bc3deb completed April 20, 2026, 10:02 a.m.
Created at: April 10, 2026, 1:20 p.m.