Triple

T19196063
Position Surface form Disambiguated ID Type / Status
Subject Line 35 (Shenzhen Metro) E469969 entity
Predicate isInPlanningPhaseOf P119999 FINISHED
Object Shenzhen Metro long-term development plan LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Shenzhen Metro long-term development plan | Statement: [Line 35 (Shenzhen Metro), isInPlanningPhaseOf, Shenzhen Metro long-term development plan]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: isInPlanningPhaseOf
Context triple: [Line 35 (Shenzhen Metro), isInPlanningPhaseOf, Shenzhen Metro long-term development plan]
  • A. isPartOfPhase chosen
    Indicates that something belongs to, occurs within, or constitutes a component of a specific phase in a larger process or lifecycle.
  • B. hasPlanningStatus
    Indicates that an entity is associated with a particular stage, condition, or outcome in a planning or approval process.
  • C. hasPlanningType
    Indicates that an entity is associated with a specific category or type used for planning or scheduling purposes.
  • D. hasPlanningLevel
    Indicates that an entity is associated with a specific stage, tier, or granularity within a planning or scheduling hierarchy.
  • E. hasPlanningContext
    Indicates that an entity is associated with a specific planning-related situation, scope, or set of conditions that frame how it should be interpreted or used.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8dd0ad9088190a173b32657ae2e7a completed April 10, 2026, 11:20 a.m.
NER Named-entity recognition batch_69e5f8a5dabc81908fffad811f177b03 completed April 20, 2026, 9:57 a.m.
PD Predicate disambiguation batch_69e4b9bb158481909478ca2e06f3ba39 completed April 19, 2026, 11:17 a.m.
Created at: April 10, 2026, 12:07 p.m.