Triple
T19182672
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Walter A. Shewhart |
E469614
|
entity |
| Predicate | notableWork |
P4
|
FINISHED |
| Object | Shewhart control chart |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Shewhart control chart | Statement: [Walter A. Shewhart, notableWork, Shewhart control chart]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Shewhart control chart Context triple: [Walter A. Shewhart, notableWork, Shewhart control chart]
-
A.
SQC
SQC is the standard national qualification certificate awarded to students in Scotland for completing secondary and further education courses.
-
B.
Pareto chart
A Pareto chart is a bar graph combined with a line graph used in quality control and data analysis to highlight the most significant factors in a dataset by ordering categories from highest to lowest frequency or impact.
-
C.
Six Sigma
Six Sigma is a data-driven methodology and set of tools for process improvement that aims to reduce defects and variability in manufacturing and business operations.
-
D.
International Recommendations for Industrial Statistics
International Recommendations for Industrial Statistics is a key United Nations Statistics Division framework that provides internationally agreed concepts, definitions, and methodological guidelines for the collection and compilation of industrial statistics.
-
E.
SPC
SPC is the acronym for the United Arab Emirates' Supreme Petroleum Council, the top governing body overseeing the country’s oil and gas sector.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Shewhart control chart Target entity description: The Shewhart control chart is a foundational statistical process control tool that uses time-ordered data and control limits to distinguish common-cause from special-cause variation in manufacturing and other processes.
-
A.
SQC
SQC is the standard national qualification certificate awarded to students in Scotland for completing secondary and further education courses.
-
B.
Pareto chart
A Pareto chart is a bar graph combined with a line graph used in quality control and data analysis to highlight the most significant factors in a dataset by ordering categories from highest to lowest frequency or impact.
-
C.
Six Sigma
Six Sigma is a data-driven methodology and set of tools for process improvement that aims to reduce defects and variability in manufacturing and business operations.
-
D.
International Recommendations for Industrial Statistics
International Recommendations for Industrial Statistics is a key United Nations Statistics Division framework that provides internationally agreed concepts, definitions, and methodological guidelines for the collection and compilation of industrial statistics.
-
E.
SPC
SPC is the acronym for the United Arab Emirates' Supreme Petroleum Council, the top governing body overseeing the country’s oil and gas sector.
- F. None of above. chosen
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8dd09d5a081909ae43c286651ae5a |
completed | April 10, 2026, 11:20 a.m. |
| NER | Named-entity recognition | batch_69e5f61e1c248190ba9e220c1be61ef8 |
completed | April 20, 2026, 9:47 a.m. |
Created at: April 10, 2026, 12:07 p.m.