Triple

T19140602
Position Surface form Disambiguated ID Type / Status
Subject National Printing Bureau (Japan) E468544 entity
Predicate hasFacility P105 FINISHED
Object Odawara Plant NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Odawara Plant | Statement: [National Printing Bureau (Japan), hasFacility, Odawara Plant]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Odawara Plant
Context triple: [National Printing Bureau (Japan), hasFacility, Odawara Plant]
  • A. Takinogawa Plant
    Takinogawa Plant is a major production facility of Japan’s National Printing Bureau, primarily involved in manufacturing secure printed materials such as banknotes and official documents.
  • B. Fujieda Plant
    Fujieda Plant is a Chugai Pharmaceutical facility in Japan that serves as a key site for the company’s pharmaceutical research, development, and related operations.
  • C. Ohakuri Power Station
    Ohakuri Power Station is a major hydroelectric power station on New Zealand’s North Island that harnesses the Waikato River to generate electricity.
  • D. Tsutsumi plant, Japan
    The Tsutsumi plant in Japan is a major Toyota manufacturing facility known for producing popular models like the Toyota Camry and for its advanced, environmentally focused production technologies.
  • E. Ikata Nuclear Power Plant
    The Ikata Nuclear Power Plant is a coastal nuclear power facility in Ehime Prefecture, Japan, that has been a focal point of the country’s post-Fukushima energy and safety debates.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Odawara Plant
Target entity description: Odawara Plant is a major production facility of Japan’s National Printing Bureau, primarily involved in manufacturing secure printed materials such as banknotes and official documents.
  • A. Takinogawa Plant
    Takinogawa Plant is a major production facility of Japan’s National Printing Bureau, primarily involved in manufacturing secure printed materials such as banknotes and official documents.
  • B. Fujieda Plant
    Fujieda Plant is a Chugai Pharmaceutical facility in Japan that serves as a key site for the company’s pharmaceutical research, development, and related operations.
  • C. Ohakuri Power Station
    Ohakuri Power Station is a major hydroelectric power station on New Zealand’s North Island that harnesses the Waikato River to generate electricity.
  • D. Tsutsumi plant, Japan
    The Tsutsumi plant in Japan is a major Toyota manufacturing facility known for producing popular models like the Toyota Camry and for its advanced, environmentally focused production technologies.
  • E. Ikata Nuclear Power Plant
    The Ikata Nuclear Power Plant is a coastal nuclear power facility in Ehime Prefecture, Japan, that has been a focal point of the country’s post-Fukushima energy and safety debates.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8dd0796a48190b34ce4cd9d3f3be5 completed April 10, 2026, 11:20 a.m.
NER Named-entity recognition batch_69e5e3f094f88190996279d7b548edea completed April 20, 2026, 8:29 a.m.
Created at: April 10, 2026, 12:05 p.m.