Triple

T19125904
Position Surface form Disambiguated ID Type / Status
Subject Edgewater Drive seawall E468181 entity
Predicate instanceOf P0 FINISHED
Object coastal protective structure C3669 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: coastal protective structure
Context triple: [Edgewater Drive seawall, instanceOf, coastal protective structure]
  • A. maritime structure
    A maritime structure is a man-made construction located in or near bodies of water, designed to support marine activities such as navigation, transportation, resource extraction, or coastal protection.
  • B. seawall chosen
    A seawall is a coastal defense structure built parallel to the shoreline to protect land and infrastructure from wave action, erosion, and storm surges.
  • C. lock and dam structure
    A lock and dam structure is an engineered system on a waterway that combines a gated dam to control water levels with a lock chamber to raise and lower vessels between different elevations for safe and efficient navigation.
  • D. flood control facility
    A flood control facility is an engineered structure or system designed to manage, divert, store, or reduce excess water flow to prevent or mitigate flooding in surrounding areas.
  • E. artificial embankment
    An artificial embankment is a man-made raised structure of earth, rock, or other materials built to contain, redirect, or protect land and infrastructure from water or other environmental forces.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8dd0796a48190b34ce4cd9d3f3be5 completed April 10, 2026, 11:20 a.m.
Created at: April 10, 2026, 12:05 p.m.