Triple
T19124727
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Rosenwald schools program |
E468146
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | school building program |
C41058
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: school building program Context triple: [Rosenwald schools program, instanceOf, school building program]
-
A.
school building
A school building is a dedicated physical structure designed to provide safe, functional spaces for teaching, learning, and related educational activities.
-
B.
school voucher program
A school voucher program is a policy that provides public funds to families in the form of vouchers, which they can use to pay for tuition at eligible private or public schools of their choice.
-
C.
school board
A school board is a governing body of elected or appointed members responsible for setting policies, overseeing budgets, and guiding the strategic direction of a school district.
-
D.
public school
A public school is a government-funded educational institution that provides free, standardized instruction to students within a designated community or district.
-
E.
school meal program
A school meal program is an organized system that provides students with regular, nutritionally balanced meals during the school day, often subsidized or free to support health, learning, and food security.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8dd0796a48190b34ce4cd9d3f3be5 |
completed | April 10, 2026, 11:20 a.m. |
Created at: April 10, 2026, 12:05 p.m.