Triple
T19124617
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Trans-European transport corridor via Dover |
E468143
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | road freight corridor |
C1347
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: road freight corridor Context triple: [Trans-European transport corridor via Dover, instanceOf, road freight corridor]
-
A.
road transportation corridor
chosen
A road transportation corridor is a designated linear area of land that accommodates one or more roadways and associated infrastructure to enable the efficient movement of vehicles, goods, and people between key origins and destinations.
-
B.
freight rail corridor
A freight rail corridor is a designated railway route primarily used for the efficient, high-capacity movement of goods and cargo between industrial, commercial, and logistics hubs.
-
C.
transport corridor
A transport corridor is a designated route or geographic band that concentrates and connects major transportation infrastructure—such as roads, railways, ports, and logistics hubs—to facilitate efficient movement of people and goods between key locations.
-
D.
road transport node
A road transport node is a specific location within a road network where vehicles and travelers converge, diverge, or transfer, such as intersections, terminals, or hubs.
-
E.
north–south highway
A north–south highway is a major roadway that primarily runs in a longitudinal direction, connecting regions or cities along a north-to-south axis.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8dd0796a48190b34ce4cd9d3f3be5 |
completed | April 10, 2026, 11:20 a.m. |
Created at: April 10, 2026, 12:05 p.m.