Triple

T19118693
Position Surface form Disambiguated ID Type / Status
Subject Nishat Bagh E467977 entity
Predicate near P350 FINISHED
Object Boulevard Road, Srinagar NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Boulevard Road, Srinagar | Statement: [Nishat Bagh, near, Boulevard Road, Srinagar]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Boulevard Road, Srinagar
Context triple: [Nishat Bagh, near, Boulevard Road, Srinagar]
  • A. Kashmir Road
    Kashmir Road is a major roadway in Pakistan’s Murree region that serves as a key access route to nearby hill stations and tourist resorts such as Bhurban.
  • B. Mall Road, Shimla
    Mall Road, Shimla is the main commercial and social hub of Shimla, lined with shops, cafes, and colonial-era buildings and popular for leisurely walks and tourism.
  • C. Mall Road, Murree
    Mall Road, Murree is the main commercial and tourist street of the Murree hill station in Pakistan, lined with shops, restaurants, and hotels and serving as the town’s central promenade.
  • D. Kallar Syedan–Rawat Road
    Kallar Syedan–Rawat Road is a regional roadway in Punjab, Pakistan, connecting the town of Kallar Syedan with the Rawat area near Rawalpindi.
  • E. Kashmir Highway (Srinagar Highway), Islamabad
    Kashmir Highway (renamed Srinagar Highway) is a major east–west arterial road in Islamabad that links key government, diplomatic, and residential areas with the city’s main motorways and the Islamabad International Airport.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Boulevard Road, Srinagar
Target entity description: Boulevard Road, Srinagar is a prominent lakeside thoroughfare along Dal Lake, known for its scenic views, gardens, and role as a major tourist hub in the city.
  • A. Kashmir Road
    Kashmir Road is a major roadway in Pakistan’s Murree region that serves as a key access route to nearby hill stations and tourist resorts such as Bhurban.
  • B. Mall Road, Shimla
    Mall Road, Shimla is the main commercial and social hub of Shimla, lined with shops, cafes, and colonial-era buildings and popular for leisurely walks and tourism.
  • C. Mall Road, Murree
    Mall Road, Murree is the main commercial and tourist street of the Murree hill station in Pakistan, lined with shops, restaurants, and hotels and serving as the town’s central promenade.
  • D. Kallar Syedan–Rawat Road
    Kallar Syedan–Rawat Road is a regional roadway in Punjab, Pakistan, connecting the town of Kallar Syedan with the Rawat area near Rawalpindi.
  • E. Kashmir Highway (Srinagar Highway), Islamabad
    Kashmir Highway (renamed Srinagar Highway) is a major east–west arterial road in Islamabad that links key government, diplomatic, and residential areas with the city’s main motorways and the Islamabad International Airport.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8dd06a26481908039e2a1bae8c597 completed April 10, 2026, 11:20 a.m.
NER Named-entity recognition batch_69e5e3c756a88190942930e6ae7242a7 completed April 20, 2026, 8:28 a.m.
Created at: April 10, 2026, 12:05 p.m.