Triple

T19116852
Position Surface form Disambiguated ID Type / Status
Subject Gimpo–Haneda route E467928 entity
Predicate alsoKnownAs P39 FINISHED
Object GMP–HND route NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: GMP–HND route | Statement: [Gimpo–Haneda route, alsoKnownAs, GMP–HND route]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: GMP–HND route
Context triple: [Gimpo–Haneda route, alsoKnownAs, GMP–HND route]
  • A. Mweka Route
    Mweka Route is a popular descent trail on Mount Kilimanjaro, primarily used by climbers returning from the summit through the mountain’s southern slopes.
  • B. GMP chosen
    GMP is the IATA airport code for Gimpo International Airport, a major airport serving the Seoul metropolitan area in South Korea.
  • C. Preiss–Handler pathway
    The Preiss–Handler pathway is a metabolic route in which cells convert nicotinic acid (niacin) into NAD+, a vital coenzyme involved in redox reactions and energy metabolism.
  • D. M-highway
    An M-highway is a major class of motorway in certain countries, typically designed for high-speed, long-distance vehicular traffic with controlled access.
  • E. Heckmair Route
    The Heckmair Route is the classic and historically significant alpine climbing line that makes the first-ascent path up the notorious north face of the Eiger.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8dd06a26481908039e2a1bae8c597 completed April 10, 2026, 11:20 a.m.
NER Named-entity recognition batch_69e5e3984bf48190818fa2b01b75decb completed April 20, 2026, 8:28 a.m.
Created at: April 10, 2026, 12:05 p.m.