Triple
T19109086
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Mooncoin |
E467738
|
entity |
| Predicate | hasRoadConnection |
P385
|
FINISHED |
| Object | N24 road |
—
|
NE NERFINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: N24 road | Statement: [Mooncoin, hasRoadConnection, N24 road]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: N24 road Context triple: [Mooncoin, hasRoadConnection, N24 road]
-
A.
N24 road
chosen
The N24 road is a national primary route in Ireland that connects Limerick to Waterford, passing through several counties in the south including County Kilkenny.
-
B.
N240 road
The N240 road is a regional roadway in Belgium that connects the town of Jodoigne with other nearby localities in Wallonia.
-
C.
N28 road
The N28 road is a national primary route in County Cork, Ireland, linking Cork city to the port town of Ringaskiddy and serving as a key access road to the region’s industrial and ferry facilities.
-
D.
N21 road
The N21 road is a major national primary route in Ireland that connects Limerick to Tralee, serving as a key link through County Kerry and County Limerick.
-
E.
N25 road
The N25 road is a major national primary route in Ireland that runs along the south coast, linking Cork with Waterford and other key towns.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8dd06a26481908039e2a1bae8c597 |
completed | April 10, 2026, 11:20 a.m. |
| NER | Named-entity recognition | batch_69e5e392ef488190a230b1d2890b2a9d |
completed | April 20, 2026, 8:28 a.m. |
Created at: April 10, 2026, 12:04 p.m.