Triple

T19102267
Position Surface form Disambiguated ID Type / Status
Subject Indian national grid E467561 entity
Predicate synchronizationCompleted P134382 FINISHED
Object 2013 LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 2013 | Statement: [Indian national grid, synchronizationCompleted, 2013]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: synchronizationCompleted
Context triple: [Indian national grid, synchronizationCompleted, 2013]
  • A. synchronizationTrigger
    Indicates that one process, event, or condition initiates or controls the timing of another so they occur in a coordinated or synchronized manner.
  • B. synchronizesWith
    Indicates that two or more entities coordinate their states or activities so that they occur in step or remain temporally consistent with each other.
  • C. closureCompleted
    Indicates that a previously initiated closure process or shutdown has been fully and successfully completed.
  • D. synchronizationBoundary
    Indicates a point or condition at which concurrent or distributed processes must align or coordinate their states or actions to maintain consistency.
  • E. dataSyncedTo
    Indicates that a set of data has been successfully synchronized from one system or location to another, reflecting the same state or contents.
  • F. None of above. chosen

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8dd05ac4c8190b1967d8f97f3fb2f completed April 10, 2026, 11:20 a.m.
NER Named-entity recognition batch_69e5e36e9bfc8190bbaccab169394d99 completed April 20, 2026, 8:27 a.m.
PD Predicate disambiguation batch_69e4b9ac41848190afd0f33b42cebe99 completed April 19, 2026, 11:17 a.m.
PDg Predicate description generation batch_69e4bfe8a06081909fd5c28a33e9f218 completed April 19, 2026, 11:43 a.m.
Created at: April 10, 2026, 12:04 p.m.