Triple
T19102261
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Indian national grid |
E467561
|
entity |
| Predicate | interconnectedWith |
P845
|
FINISHED |
| Object | Nepal power grid |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Nepal power grid | Statement: [Indian national grid, interconnectedWith, Nepal power grid]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Nepal power grid Context triple: [Indian national grid, interconnectedWith, Nepal power grid]
-
A.
Upper Karnali Hydropower Project
The Upper Karnali Hydropower Project is a major planned run-of-river hydroelectric development in Nepal designed to harness the Karnali River for large-scale power generation and regional energy export.
-
B.
Upper Bhote Koshi Hydroelectric Project
The Upper Bhote Koshi Hydroelectric Project is a run-of-river hydropower plant in Nepal that harnesses the steep gradient and strong flow of the Bhote Koshi River to generate electricity for the national grid.
-
C.
Ganguwal Power House
Ganguwal Power House is a hydroelectric power station in Punjab, India, that generates electricity using water released from the Bhakra–Nangal dam system.
-
D.
Lower Tamakoshi Hydropower Project
The Lower Tamakoshi Hydropower Project is a major run-of-river hydroelectric power plant in Nepal that significantly contributes to the country’s electricity generation and energy security.
-
E.
Karepiro (Karapiro) Power Station
Karepiro (Karapiro) Power Station is a hydroelectric power station on New Zealand’s Waikato River, known for generating renewable electricity as part of the country’s largest hydroelectric river system.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Nepal power grid Target entity description: The Nepal power grid is the national electricity transmission and distribution network of Nepal, which supplies power across the country and is linked to neighboring systems for cross-border energy exchange.
-
A.
Upper Karnali Hydropower Project
The Upper Karnali Hydropower Project is a major planned run-of-river hydroelectric development in Nepal designed to harness the Karnali River for large-scale power generation and regional energy export.
-
B.
Upper Bhote Koshi Hydroelectric Project
The Upper Bhote Koshi Hydroelectric Project is a run-of-river hydropower plant in Nepal that harnesses the steep gradient and strong flow of the Bhote Koshi River to generate electricity for the national grid.
-
C.
Ganguwal Power House
Ganguwal Power House is a hydroelectric power station in Punjab, India, that generates electricity using water released from the Bhakra–Nangal dam system.
-
D.
Lower Tamakoshi Hydropower Project
The Lower Tamakoshi Hydropower Project is a major run-of-river hydroelectric power plant in Nepal that significantly contributes to the country’s electricity generation and energy security.
-
E.
Karepiro (Karapiro) Power Station
Karepiro (Karapiro) Power Station is a hydroelectric power station on New Zealand’s Waikato River, known for generating renewable electricity as part of the country’s largest hydroelectric river system.
- F. None of above. chosen
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8dd05ac4c8190b1967d8f97f3fb2f |
completed | April 10, 2026, 11:20 a.m. |
| NER | Named-entity recognition | batch_69e5e36e9bfc8190bbaccab169394d99 |
completed | April 20, 2026, 8:27 a.m. |
Created at: April 10, 2026, 12:04 p.m.