Triple

T19102255
Position Surface form Disambiguated ID Type / Status
Subject Indian national grid E467561 entity
Predicate hasControlCenter P49780 FINISHED
Object Regional Load Despatch Centres NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Regional Load Despatch Centres | Statement: [Indian national grid, hasControlCenter, Regional Load Despatch Centres]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Regional Load Despatch Centres
Context triple: [Indian national grid, hasControlCenter, Regional Load Despatch Centres]
  • A. Logistics Center
    The Logistics Center is a U.S. Army facility responsible for managing the supply, maintenance, and distribution of aviation and missile-related materiel and support services.
  • B. Regional Data-processing Centres
    Regional Data-processing Centres are specialized facilities within the Global Data-processing and Forecasting System that collect, process, and analyze regional meteorological and related data to support weather forecasting and climate services.
  • C. EC2 postal district
    The EC2 postal district is a central London area covering part of the City’s financial core, including major banking and commercial streets.
  • D. Home Delivery Network
    Home Delivery Network was a UK-based parcel delivery company that later rebranded as Yodel, providing nationwide home delivery and courier services.
  • E. Centrs
    Centrs is the central district of Riga, Latvia, known for its historic architecture, cultural institutions, and commercial activity.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Regional Load Despatch Centres
Target entity description: Regional Load Despatch Centres are specialized operational hubs in India responsible for real-time monitoring, coordination, and control of electricity transmission across designated regions of the national power grid.
  • A. Logistics Center
    The Logistics Center is a U.S. Army facility responsible for managing the supply, maintenance, and distribution of aviation and missile-related materiel and support services.
  • B. Regional Data-processing Centres
    Regional Data-processing Centres are specialized facilities within the Global Data-processing and Forecasting System that collect, process, and analyze regional meteorological and related data to support weather forecasting and climate services.
  • C. EC2 postal district
    The EC2 postal district is a central London area covering part of the City’s financial core, including major banking and commercial streets.
  • D. Home Delivery Network
    Home Delivery Network was a UK-based parcel delivery company that later rebranded as Yodel, providing nationwide home delivery and courier services.
  • E. Centrs
    Centrs is the central district of Riga, Latvia, known for its historic architecture, cultural institutions, and commercial activity.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8dd05ac4c8190b1967d8f97f3fb2f completed April 10, 2026, 11:20 a.m.
NER Named-entity recognition batch_69e5e36e9bfc8190bbaccab169394d99 completed April 20, 2026, 8:27 a.m.
Created at: April 10, 2026, 12:04 p.m.