Triple
T19102237
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Indian national grid |
E467561
|
entity |
| Predicate | hasPart |
P35
|
FINISHED |
| Object | Western Regional Grid |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Western Regional Grid | Statement: [Indian national grid, hasPart, Western Regional Grid]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Western Regional Grid Context triple: [Indian national grid, hasPart, Western Regional Grid]
-
A.
Midcontinent Independent System Operator region
The Midcontinent Independent System Operator region is a large North American electric transmission and wholesale power market area coordinated by MISO, spanning multiple U.S. states and parts of Canada to ensure reliable, efficient grid operations.
-
B.
Eastern Interconnection
The Eastern Interconnection is one of North America's major synchronized AC power grids, spanning much of the eastern and central United States and parts of Canada.
-
C.
Western Interconnection
The Western Interconnection is a major synchronized electric power grid that spans much of western North America, linking utilities and power plants across multiple U.S. states, Canadian provinces, and parts of Mexico.
-
D.
WECC region
The WECC region is the vast Western North American electric power grid area overseen for reliability and coordination by the Western Electricity Coordinating Council.
-
E.
Southwest U.S. electrical grid
The Southwest U.S. electrical grid is a major regional power network that transmits and distributes electricity across the southwestern United States, integrating generation resources and interconnections with neighboring grids.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Western Regional Grid Target entity description: The Western Regional Grid is a major regional power grid in India that coordinates electricity generation and transmission across several western states as part of the national grid system.
-
A.
Midcontinent Independent System Operator region
The Midcontinent Independent System Operator region is a large North American electric transmission and wholesale power market area coordinated by MISO, spanning multiple U.S. states and parts of Canada to ensure reliable, efficient grid operations.
-
B.
Eastern Interconnection
The Eastern Interconnection is one of North America's major synchronized AC power grids, spanning much of the eastern and central United States and parts of Canada.
-
C.
Western Interconnection
The Western Interconnection is a major synchronized electric power grid that spans much of western North America, linking utilities and power plants across multiple U.S. states, Canadian provinces, and parts of Mexico.
-
D.
WECC region
The WECC region is the vast Western North American electric power grid area overseen for reliability and coordination by the Western Electricity Coordinating Council.
-
E.
Southwest U.S. electrical grid
The Southwest U.S. electrical grid is a major regional power network that transmits and distributes electricity across the southwestern United States, integrating generation resources and interconnections with neighboring grids.
- F. None of above. chosen
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8dd05ac4c8190b1967d8f97f3fb2f |
completed | April 10, 2026, 11:20 a.m. |
| NER | Named-entity recognition | batch_69e5e36e9bfc8190bbaccab169394d99 |
completed | April 20, 2026, 8:27 a.m. |
Created at: April 10, 2026, 12:04 p.m.