Triple
T19102199
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Sutlej River hydroelectric projects |
E467560
|
entity |
| Predicate | includesProject |
P14971
|
FINISHED |
| Object | Shongtong Karcham Hydroelectric Project |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Shongtong Karcham Hydroelectric Project | Statement: [Sutlej River hydroelectric projects, includesProject, Shongtong Karcham Hydroelectric Project]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Shongtong Karcham Hydroelectric Project Context triple: [Sutlej River hydroelectric projects, includesProject, Shongtong Karcham Hydroelectric Project]
-
A.
Wangtoo Hydroelectric Project
Wangtoo Hydroelectric Project is a hydroelectric power station in Himachal Pradesh, India, that harnesses the Sutlej River to generate electricity for the region.
-
B.
Kuri Chhu Hydropower Plant
Kuri Chhu Hydropower Plant is a hydroelectric power station in Bhutan that harnesses the flow of the Kuri Chhu River to generate electricity for the national grid.
-
C.
Dasu Hydropower Project area
The Dasu Hydropower Project area is a major hydroelectric development site on the Indus River in Pakistan’s Kohistan District, planned to generate significant power as part of the country’s long-term energy and water management strategy.
-
D.
Doyang Hydro Project
Doyang Hydro Project is a hydroelectric power and irrigation facility located on the Doyang River in Nagaland, India.
-
E.
Upper Bhote Koshi Hydroelectric Project
The Upper Bhote Koshi Hydroelectric Project is a run-of-river hydropower plant in Nepal that harnesses the steep gradient and strong flow of the Bhote Koshi River to generate electricity for the national grid.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Shongtong Karcham Hydroelectric Project Target entity description: Shongtong Karcham Hydroelectric Project is a major run-of-the-river hydropower plant on the Sutlej River in Himachal Pradesh, India, developed to generate electricity by harnessing the river’s steep Himalayan gradient.
-
A.
Wangtoo Hydroelectric Project
Wangtoo Hydroelectric Project is a hydroelectric power station in Himachal Pradesh, India, that harnesses the Sutlej River to generate electricity for the region.
-
B.
Kuri Chhu Hydropower Plant
Kuri Chhu Hydropower Plant is a hydroelectric power station in Bhutan that harnesses the flow of the Kuri Chhu River to generate electricity for the national grid.
-
C.
Dasu Hydropower Project area
The Dasu Hydropower Project area is a major hydroelectric development site on the Indus River in Pakistan’s Kohistan District, planned to generate significant power as part of the country’s long-term energy and water management strategy.
-
D.
Doyang Hydro Project
Doyang Hydro Project is a hydroelectric power and irrigation facility located on the Doyang River in Nagaland, India.
-
E.
Upper Bhote Koshi Hydroelectric Project
The Upper Bhote Koshi Hydroelectric Project is a run-of-river hydropower plant in Nepal that harnesses the steep gradient and strong flow of the Bhote Koshi River to generate electricity for the national grid.
- F. None of above. chosen
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8dd05ac4c8190b1967d8f97f3fb2f |
completed | April 10, 2026, 11:20 a.m. |
| NER | Named-entity recognition | batch_69e5e36e9bfc8190bbaccab169394d99 |
completed | April 20, 2026, 8:27 a.m. |
Created at: April 10, 2026, 12:04 p.m.