Triple

T19102195
Position Surface form Disambiguated ID Type / Status
Subject Sutlej River hydroelectric projects E467560 entity
Predicate includesProject P14971 FINISHED
Object Rampur Hydroelectric Project NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Rampur Hydroelectric Project | Statement: [Sutlej River hydroelectric projects, includesProject, Rampur Hydroelectric Project]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Rampur Hydroelectric Project
Context triple: [Sutlej River hydroelectric projects, includesProject, Rampur Hydroelectric Project]
  • A. Parbati Hydroelectric Project
    The Parbati Hydroelectric Project is a major hydroelectric power development in Himachal Pradesh, India, designed to harness the Parbati River for large-scale electricity generation.
  • B. Bhadra Hydel Project
    Bhadra Hydel Project is a hydroelectric power station in Karnataka, India, that harnesses the flow of the Bhadra River to generate electricity and support regional irrigation.
  • C. Ujjani Hydroelectric Project
    Ujjani Hydroelectric Project is a power-generating facility in Maharashtra, India, that harnesses the water stored by the Ujjani Dam to produce hydroelectric energy.
  • D. Srinagar Hydroelectric Project
    The Srinagar Hydroelectric Project is a major run-of-the-river power plant on the Alaknanda River in Uttarakhand, India, built to generate electricity and support regional power needs.
  • E. Indravati Hydroelectric Project
    Indravati Hydroelectric Project is a major hydroelectric power station in India that harnesses the waters of the Indravati River to generate electricity and support regional development.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Rampur Hydroelectric Project
Target entity description: Rampur Hydroelectric Project is a run-of-the-river hydroelectric power station in Himachal Pradesh, India, that harnesses the Sutlej River to generate electricity.
  • A. Parbati Hydroelectric Project
    The Parbati Hydroelectric Project is a major hydroelectric power development in Himachal Pradesh, India, designed to harness the Parbati River for large-scale electricity generation.
  • B. Bhadra Hydel Project
    Bhadra Hydel Project is a hydroelectric power station in Karnataka, India, that harnesses the flow of the Bhadra River to generate electricity and support regional irrigation.
  • C. Ujjani Hydroelectric Project
    Ujjani Hydroelectric Project is a power-generating facility in Maharashtra, India, that harnesses the water stored by the Ujjani Dam to produce hydroelectric energy.
  • D. Srinagar Hydroelectric Project
    The Srinagar Hydroelectric Project is a major run-of-the-river power plant on the Alaknanda River in Uttarakhand, India, built to generate electricity and support regional power needs.
  • E. Indravati Hydroelectric Project
    Indravati Hydroelectric Project is a major hydroelectric power station in India that harnesses the waters of the Indravati River to generate electricity and support regional development.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8dd05ac4c8190b1967d8f97f3fb2f completed April 10, 2026, 11:20 a.m.
NER Named-entity recognition batch_69e5e36e9bfc8190bbaccab169394d99 completed April 20, 2026, 8:27 a.m.
Created at: April 10, 2026, 12:04 p.m.