Triple

T19102109
Position Surface form Disambiguated ID Type / Status
Subject Wangtoo E467558 entity
Predicate near P350 FINISHED
Object Karcham Wangtoo Hydroelectric Plant NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Karcham Wangtoo Hydroelectric Plant | Statement: [Wangtoo, near, Karcham Wangtoo Hydroelectric Plant]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Karcham Wangtoo Hydroelectric Plant
Context triple: [Wangtoo, near, Karcham Wangtoo Hydroelectric Plant]
  • A. Kuri Chhu Hydropower Plant
    Kuri Chhu Hydropower Plant is a hydroelectric power station in Bhutan that harnesses the flow of the Kuri Chhu River to generate electricity for the national grid.
  • B. Dasu Hydropower Project area
    The Dasu Hydropower Project area is a major hydroelectric development site on the Indus River in Pakistan’s Kohistan District, planned to generate significant power as part of the country’s long-term energy and water management strategy.
  • C. Karcham Wangtoo Dam chosen
    Karcham Wangtoo Dam is a major hydroelectric gravity dam in Himachal Pradesh, India, known for its large underground power station harnessing the Sutlej River in the Himalayas.
  • D. Kishanganga Hydroelectric Plant
    The Kishanganga Hydroelectric Plant is a run-of-the-river hydroelectric power station in Jammu and Kashmir, India, built on a tributary of the Jhelum to generate electricity and support regional water management.
  • E. Karuma Hydropower Station
    Karuma Hydropower Station is a major hydroelectric power plant in Uganda that harnesses the flow of the Victoria Nile to generate electricity for the national grid.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8dd05ac4c8190b1967d8f97f3fb2f completed April 10, 2026, 11:20 a.m.
NER Named-entity recognition batch_69e5e36e9bfc8190bbaccab169394d99 completed April 20, 2026, 8:27 a.m.
Created at: April 10, 2026, 12:04 p.m.