Triple

T19102098
Position Surface form Disambiguated ID Type / Status
Subject Karcham E467557 entity
Predicate hasNearbyHydroelectricProject P120742 FINISHED
Object Wangtoo Hydroelectric Project NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Wangtoo Hydroelectric Project | Statement: [Karcham, hasNearbyHydroelectricProject, Wangtoo Hydroelectric Project]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Wangtoo Hydroelectric Project
Context triple: [Karcham, hasNearbyHydroelectricProject, Wangtoo Hydroelectric Project]
  • A. Doyang Hydro Project
    Doyang Hydro Project is a hydroelectric power and irrigation facility located on the Doyang River in Nagaland, India.
  • B. Punatsangchhu-I Hydroelectric Project
    Punatsangchhu-I Hydroelectric Project is a major run-of-the-river hydropower plant under construction in Bhutan, developed with Indian assistance to generate electricity for domestic use and export.
  • C. Karot Hydropower Project
    The Karot Hydropower Project is a major run-of-river hydroelectric power plant on the Jhelum River in Pakistan, developed under the China–Pakistan Economic Corridor to boost the country’s electricity generation capacity.
  • D. Nam Ou River hydropower project
    The Nam Ou River hydropower project is a large cascade of dams and power stations on Laos’s Nam Ou River developed primarily by Chinese companies to generate electricity and support regional energy and infrastructure goals.
  • E. Theun-Hinboun Hydropower Project
    The Theun-Hinboun Hydropower Project is a major hydroelectric dam and power generation scheme in Laos, developed to export electricity to neighboring countries while significantly impacting local river ecosystems and communities.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Wangtoo Hydroelectric Project
Target entity description: Wangtoo Hydroelectric Project is a hydroelectric power station in Himachal Pradesh, India, that harnesses the Sutlej River to generate electricity for the region.
  • A. Doyang Hydro Project
    Doyang Hydro Project is a hydroelectric power and irrigation facility located on the Doyang River in Nagaland, India.
  • B. Punatsangchhu-I Hydroelectric Project
    Punatsangchhu-I Hydroelectric Project is a major run-of-the-river hydropower plant under construction in Bhutan, developed with Indian assistance to generate electricity for domestic use and export.
  • C. Karot Hydropower Project
    The Karot Hydropower Project is a major run-of-river hydroelectric power plant on the Jhelum River in Pakistan, developed under the China–Pakistan Economic Corridor to boost the country’s electricity generation capacity.
  • D. Nam Ou River hydropower project
    The Nam Ou River hydropower project is a large cascade of dams and power stations on Laos’s Nam Ou River developed primarily by Chinese companies to generate electricity and support regional energy and infrastructure goals.
  • E. Theun-Hinboun Hydropower Project
    The Theun-Hinboun Hydropower Project is a major hydroelectric dam and power generation scheme in Laos, developed to export electricity to neighboring countries while significantly impacting local river ecosystems and communities.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8dd05ac4c8190b1967d8f97f3fb2f completed April 10, 2026, 11:20 a.m.
NER Named-entity recognition batch_69e5e36e9bfc8190bbaccab169394d99 completed April 20, 2026, 8:27 a.m.
Created at: April 10, 2026, 12:04 p.m.