Triple
T19031410
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | SM City San Fernando Downtown |
E465747
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | SM Supermall |
C1998
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: SM Supermall Context triple: [SM City San Fernando Downtown, instanceOf, SM Supermall]
-
A.
shopping mall
chosen
A shopping mall is a large, often enclosed commercial complex that houses multiple retail stores, dining options, and services connected by shared walkways and common areas.
-
B.
shopping centre
A shopping centre is a large complex of retail stores, services, and often entertainment facilities planned and managed as a single commercial property.
-
C.
sōgō shōsha
A sōgō shōsha is a large Japanese general trading company that engages in diversified global business activities, including trading, investment, logistics, and project development across multiple industries.
-
D.
supermarket
A supermarket is a large self-service retail store that offers a wide variety of food, household goods, and everyday products organized into aisles and departments.
-
E.
UP Express station
A UP Express station is a designated rail facility where Union Pearson Express trains stop to pick up and drop off passengers traveling between downtown Toronto and Toronto Pearson International Airport.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8dd0359648190bc2a9202c5cf29d2 |
completed | April 10, 2026, 11:20 a.m. |
Created at: April 10, 2026, 12:02 p.m.