Triple

T19025675
Position Surface form Disambiguated ID Type / Status
Subject Mountbatten Plan E465603 entity
Predicate relatedTo P37 FINISHED
Object 3 June Plan NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 3 June Plan | Statement: [Mountbatten Plan, relatedTo, 3 June Plan]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: 3 June Plan
Context triple: [Mountbatten Plan, relatedTo, 3 June Plan]
  • A. Peking Plan
    The Peking Plan was a World War II naval operation in which several Polish destroyers, including ORP Grom, were evacuated from the Baltic Sea to British waters just before the German invasion of Poland.
  • B. Aldrich Plan
    The Aldrich Plan was an early 20th-century proposal for a centralized U.S. banking system that served as a key precursor to the creation of the Federal Reserve System.
  • C. Morgenthau Plan
    The Morgenthau Plan was a controversial World War II-era proposal to deindustrialize Germany and transform it into a primarily agrarian society to prevent it from ever again becoming a military threat.
  • D. Manstein Plan
    The Manstein Plan was a German World War II operational strategy that called for a surprise armored thrust through the Ardennes to encircle Allied forces and rapidly defeat France in 1940.
  • E. Six-Point Peace Plan
    The Six-Point Peace Plan is a diplomatic agreement brokered to halt hostilities and establish basic principles for resolving the 2008 conflict between Russia and Georgia.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: 3 June Plan
Target entity description: The 3 June Plan was the 1947 British proposal that outlined the partition of British India into the independent dominions of India and Pakistan.
  • A. Peking Plan
    The Peking Plan was a World War II naval operation in which several Polish destroyers, including ORP Grom, were evacuated from the Baltic Sea to British waters just before the German invasion of Poland.
  • B. Aldrich Plan
    The Aldrich Plan was an early 20th-century proposal for a centralized U.S. banking system that served as a key precursor to the creation of the Federal Reserve System.
  • C. Morgenthau Plan
    The Morgenthau Plan was a controversial World War II-era proposal to deindustrialize Germany and transform it into a primarily agrarian society to prevent it from ever again becoming a military threat.
  • D. Manstein Plan
    The Manstein Plan was a German World War II operational strategy that called for a surprise armored thrust through the Ardennes to encircle Allied forces and rapidly defeat France in 1940.
  • E. Six-Point Peace Plan
    The Six-Point Peace Plan is a diplomatic agreement brokered to halt hostilities and establish basic principles for resolving the 2008 conflict between Russia and Georgia.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8dd025c188190a1d81f5b4ec7e2c6 completed April 10, 2026, 11:20 a.m.
NER Named-entity recognition batch_69e5d6e271848190b67ad08af35b6796 completed April 20, 2026, 7:33 a.m.
Created at: April 10, 2026, 12:02 p.m.