Triple

T1902325
Position Surface form Disambiguated ID Type / Status
Subject Naval Facilities Engineering Systems Command E37717 entity
Predicate instanceOf P0 FINISHED
Object engineering command C9966 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: engineering command
Context triple: [Naval Facilities Engineering Systems Command, instanceOf, engineering command]
  • A. engineering formation
    Engineering formation is the structured process through which individuals acquire the technical knowledge, practical skills, and professional attitudes necessary to practice as engineers within a specific social, educational, and industrial context.
  • B. logistics command
    Logistics command is the organizational function responsible for planning, coordinating, and controlling the movement, supply, and maintenance of resources to ensure operational readiness and sustained support.
  • C. engineering division
    The engineering division is an organizational unit responsible for designing, developing, and maintaining technical systems, products, and infrastructure within a company or institution.
  • D. joint command
    A joint command is a unified military authority structure that coordinates and directs operations involving multiple service branches or allied forces to achieve common strategic objectives.
  • E. theatre command
    Theatre command is a high-level military headquarters responsible for planning, directing, and coordinating operations across a broad geographic area or theater of war.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a8861be7148190a680937ec451a304 completed March 4, 2026, 7:21 p.m.
Created at: March 4, 2026, 7:35 p.m.