Triple

T19017391
Position Surface form Disambiguated ID Type / Status
Subject Keyano College E465386 entity
Predicate hasCampus P116 FINISHED
Object Suncor Energy Industrial Campus NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Suncor Energy Industrial Campus | Statement: [Keyano College, hasCampus, Suncor Energy Industrial Campus]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Suncor Energy Industrial Campus
Context triple: [Keyano College, hasCampus, Suncor Energy Industrial Campus]
  • A. Suncor Energy Centre
    Suncor Energy Centre is a prominent twin-tower office skyscraper complex that serves as one of the defining landmarks of Calgary’s downtown skyline.
  • B. Irving Oil Refinery
    Irving Oil Refinery is a major petroleum refining facility in Saint John, New Brunswick, and one of the largest oil refineries in Canada.
  • C. Sarnia–Lambton petrochemical complex
    The Sarnia–Lambton petrochemical complex is a major Canadian industrial hub in Ontario known for its extensive network of refineries and chemical plants that form a key center of the country’s petrochemical production.
  • D. Oakville Assembly Complex
    Oakville Assembly Complex is a major Ford Motor Company automotive manufacturing plant in Oakville, Ontario, Canada, known for producing various minivans and crossover vehicles.
  • E. Strathmore Energy Research Centre
    Strathmore Energy Research Centre is a research institution within Strathmore University focused on energy systems, sustainability, and related innovation in Africa.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Suncor Energy Industrial Campus
Target entity description: Suncor Energy Industrial Campus is a specialized training and education facility of Keyano College focused on industrial and energy-sector programs.
  • A. Suncor Energy Centre
    Suncor Energy Centre is a prominent twin-tower office skyscraper complex that serves as one of the defining landmarks of Calgary’s downtown skyline.
  • B. Irving Oil Refinery
    Irving Oil Refinery is a major petroleum refining facility in Saint John, New Brunswick, and one of the largest oil refineries in Canada.
  • C. Sarnia–Lambton petrochemical complex
    The Sarnia–Lambton petrochemical complex is a major Canadian industrial hub in Ontario known for its extensive network of refineries and chemical plants that form a key center of the country’s petrochemical production.
  • D. Oakville Assembly Complex
    Oakville Assembly Complex is a major Ford Motor Company automotive manufacturing plant in Oakville, Ontario, Canada, known for producing various minivans and crossover vehicles.
  • E. Strathmore Energy Research Centre
    Strathmore Energy Research Centre is a research institution within Strathmore University focused on energy systems, sustainability, and related innovation in Africa.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8dd025c188190a1d81f5b4ec7e2c6 completed April 10, 2026, 11:20 a.m.
NER Named-entity recognition batch_69e5d6dc0f9081909cddc5186603e885 completed April 20, 2026, 7:33 a.m.
Created at: April 10, 2026, 12:02 p.m.