Triple

T18990745
Position Surface form Disambiguated ID Type / Status
Subject A line E464674 entity
Predicate depot P14646 FINISHED
Object Pitkin Yard NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Pitkin Yard | Statement: [A line, depot, Pitkin Yard]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Pitkin Yard
Context triple: [A line, depot, Pitkin Yard]
  • A. Pitkin Yard chosen
    Pitkin Yard is a New York City Subway maintenance and storage facility serving trains on the IND Eighth Avenue Line in Brooklyn.
  • B. Sunnyside Yard
    Sunnyside Yard is a major rail yard in Queens, New York City, serving as a key hub for Amtrak, NJ Transit, and other commuter rail operations just east of Manhattan.
  • C. Wellington Yard
    Wellington Yard is a railway yard associated with Wellington station, used for storing, organizing, and managing trains and rolling stock.
  • D. Maybrook Yard
    Maybrook Yard was a major railroad classification yard in Maybrook, New York, that served as a key freight interchange point in the northeastern United States.
  • E. Riverside Yard
    Riverside Yard is a rail yard facility in Newton, Massachusetts, serving as a storage and maintenance area for trains on the MBTA Green Line’s D branch.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8dd01a56c81909694a128c66b21d7 completed April 10, 2026, 11:20 a.m.
NER Named-entity recognition batch_69e5d6632cb08190a28f6ab74c2156d8 completed April 20, 2026, 7:31 a.m.
Created at: April 10, 2026, 12:01 p.m.