Triple

T18986158
Position Surface form Disambiguated ID Type / Status
Subject Oriente station E464563 entity
Predicate partOf P40 FINISHED
Object Linha de Azambuja NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Linha de Azambuja | Statement: [Oriente station, partOf, Linha de Azambuja]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Linha de Azambuja
Context triple: [Oriente station, partOf, Linha de Azambuja]
  • A. Linha de Azambuja chosen
    Linha de Azambuja is a suburban railway line in the Lisbon metropolitan area that connects the capital to the town of Azambuja and serves as a key commuter corridor.
  • B. Linha de Guimarães
    Linha de Guimarães is a railway line in northern Portugal that connects Porto to the city of Guimarães, serving as an important regional passenger route.
  • C. Linha de Aveiro
    Linha de Aveiro is a suburban railway line in northern Portugal that connects Porto with the coastal city of Aveiro as part of the Porto urban rail network.
  • D. Linha de Cascais
    Linha de Cascais is a coastal suburban railway line in the Lisbon metropolitan area of Portugal, connecting central Lisbon to the seaside town of Cascais.
  • E. Linha de Braga
    Linha de Braga is a suburban railway line in northern Portugal that connects the city of Braga to the Porto metropolitan rail network.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8dd008af48190a97ff1c6488edf1b completed April 10, 2026, 11:20 a.m.
NER Named-entity recognition batch_69e5d65f7f08819088f56e8e030851b1 completed April 20, 2026, 7:31 a.m.
Created at: April 10, 2026, 12:01 p.m.