Triple

T18973286
Position Surface form Disambiguated ID Type / Status
Subject Summit Road tunnels E464226 entity
Predicate instanceOf P0 FINISHED
Object road tunnel system C4139 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: road tunnel system
Context triple: [Summit Road tunnels, instanceOf, road tunnel system]
  • A. road tunnel chosen
    A road tunnel is an underground or enclosed passageway constructed to allow vehicular traffic to pass through obstacles such as mountains, hills, or urban areas while maintaining a continuous roadway.
  • B. transportation tunnel
    A transportation tunnel is an underground or enclosed passageway designed to allow vehicles, trains, or pedestrians to travel safely through or beneath natural or man-made obstacles.
  • C. rail tunnel
    A rail tunnel is an underground or enclosed passage constructed to allow trains to travel through obstacles such as mountains, hills, or urban areas while maintaining a continuous railway route.
  • D. tunneling system
    A tunneling system is a conceptual framework or infrastructure that enables data, particles, or signals to pass through barriers or intermediate layers via a protected or probabilistic pathway without directly traversing the intervening space in a conventional manner.
  • E. roadway underpass
    A roadway underpass is a structure that allows a road to pass beneath another road, railway, or obstacle, providing grade separation and uninterrupted traffic flow.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8dd008af48190a97ff1c6488edf1b completed April 10, 2026, 11:20 a.m.
Created at: April 10, 2026, noon