Triple

T18972969
Position Surface form Disambiguated ID Type / Status
Subject Auckland Regional Land Transport Plan E464218 entity
Predicate instanceOf P0 FINISHED
Object regional land transport plan C10251 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: regional land transport plan
Context triple: [Auckland Regional Land Transport Plan, instanceOf, regional land transport plan]
  • A. regional transport plan chosen
    A regional transport plan is a strategic framework that outlines long-term goals, policies, and coordinated investments for transportation systems across a defined geographic region.
  • B. short-range transportation plan
    A short-range transportation plan is a detailed, near-term (typically 1–5 years) strategy outlining specific projects, investments, and operational changes to improve a transportation system’s performance and meet immediate mobility needs.
  • C. regional planning program
    A regional planning program is an organized framework of policies, strategies, and actions designed to guide the coordinated development, land use, infrastructure, and resource management of a specific geographic area over time.
  • D. planned transit corridor
    A planned transit corridor is a designated route or area reserved for future development of public transportation infrastructure, such as bus rapid transit or rail lines, to guide growth and improve regional mobility.
  • E. public transit plan
    A public transit plan is a structured strategy that outlines routes, schedules, resources, and policies to provide efficient, accessible, and sustainable transportation services within a community or region.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8dd008af48190a97ff1c6488edf1b completed April 10, 2026, 11:20 a.m.
Created at: April 10, 2026, noon