Triple

T18967582
Position Surface form Disambiguated ID Type / Status
Subject Ant-Man and the Wasp (2018) film score E464081 entity
Predicate instanceOf P0 FINISHED
Object Marvel Cinematic Universe score C41472 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Marvel Cinematic Universe score
Context triple: [Ant-Man and the Wasp (2018) film score, instanceOf, Marvel Cinematic Universe score]
  • A. Marvel Cinematic Universe organization
    A Marvel Cinematic Universe organization is a structured group or agency within the MCU, composed of characters united by a common purpose, hierarchy, and resources that influence the franchise’s overarching narrative and events.
  • B. Marvel Cinematic Universe phase
    A Marvel Cinematic Universe phase is a curated grouping of interconnected films and series released within a specific timeframe that collectively advance overarching story arcs and character developments in the MCU.
  • C. Marvel Cinematic Universe television season
    A Marvel Cinematic Universe television season is a collection of episodic, live-action or animated stories produced for television or streaming that are set within and contribute to the shared continuity, characters, and overarching narrative of the MCU franchise.
  • D. Marvel Cinematic Universe film
    A Marvel Cinematic Universe film is a feature-length motion picture produced by Marvel Studios that takes place within a shared continuity of interconnected superhero stories, characters, and events based on Marvel Comics.
  • E. Marvel Cinematic Universe short film
    A Marvel Cinematic Universe short film is a brief, canonical live-action or animated featurette produced by Marvel Studios that expands on characters, events, or storylines within the shared MCU continuity.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8dcffc278819086792a4ebfddfafa completed April 10, 2026, 11:20 a.m.
Created at: April 10, 2026, noon