Triple
T18965821
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | U.S. Route 20A in Massachusetts |
E464035
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | auxiliary route of U.S. Route 20 |
C41470
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: auxiliary route of U.S. Route 20 Context triple: [U.S. Route 20A in Massachusetts, instanceOf, auxiliary route of U.S. Route 20]
-
A.
U.S. Highway business route
A U.S. Highway business route is a special alignment of a U.S. Highway that diverts from the main route to pass through the downtown or commercial center of a city or town, providing local access to businesses and services.
-
B.
auxiliary Interstate Highway
An auxiliary Interstate Highway is a shorter, supplementary route connected to a primary Interstate that typically serves to bypass, loop around, or provide direct access to urban areas.
-
C.
Arizona State Route
An Arizona State Route is a numbered highway within the Arizona state highway system that facilitates regional and local transportation across various parts of the state.
-
D.
U.S. Bicycle Route
A U.S. Bicycle Route is a nationally designated, numbered cycling corridor that connects states, regions, and key destinations across the United States using a mix of on-road and off-road facilities.
-
E.
Farm to Market Road
A Farm to Market Road is a rural roadway designed to connect agricultural areas and farms with nearby towns, markets, and major transportation routes to facilitate the movement of goods and people.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8dcffc278819086792a4ebfddfafa |
completed | April 10, 2026, 11:20 a.m. |
Created at: April 10, 2026, noon