Triple

T18954995
Position Surface form Disambiguated ID Type / Status
Subject The Veil and the Vault E463748 entity
Predicate instanceOf P0 FINISHED
Object architectural concept C41457 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: architectural concept
Context triple: [The Veil and the Vault, instanceOf, architectural concept]
  • A. architectural design
    Architectural design is the conceptual and creative process of planning, organizing, and detailing the form, function, and aesthetics of built environments and structures.
  • B. architectural development
    Architectural development is the iterative process of designing, refining, and evolving a system’s structure to meet functional, technical, and stakeholder requirements over time.
  • C. architectural feature
    An architectural feature is a distinct structural or decorative element of a building or space that contributes to its function, aesthetics, or character.
  • D. architecturalFeature
    An architecturalFeature is a distinct physical or structural element of a building or built environment that contributes to its function, form, or aesthetic character.
  • E. architectural space
    Architectural space is the intentionally designed three-dimensional environment shaped by physical elements, proportions, light, and materials to support and influence human activities and experiences.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8dcffc278819086792a4ebfddfafa completed April 10, 2026, 11:20 a.m.
Created at: April 10, 2026, noon