Triple

T18932580
Position Surface form Disambiguated ID Type / Status
Subject Bowen Bridge E463152 entity
Predicate partOf P40 FINISHED
Object Hobart northern transport corridor NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Hobart northern transport corridor | Statement: [Bowen Bridge, partOf, Hobart northern transport corridor]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Hobart northern transport corridor
Context triple: [Bowen Bridge, partOf, Hobart northern transport corridor]
  • A. Adelaide north–south corridor
    The Adelaide north–south corridor is a major continuous transport route through metropolitan Adelaide, designed to streamline north–south traffic flow via a series of upgraded expressways and motorways.
  • B. Goulburn Valley transport corridor
    The Goulburn Valley transport corridor is a major freight and passenger route in regional Victoria, Australia, linking agricultural and regional centres to Melbourne and interstate markets via road and rail.
  • C. Albury–Wodonga bypass
    The Albury–Wodonga bypass is a major road project that diverts through-traffic around the twin cities of Albury and Wodonga to improve traffic flow and safety on the Hume Highway corridor.
  • D. Sydney south-western rail corridor
    The Sydney south-western rail corridor is a major suburban and intercity railway route serving the south-western suburbs of Sydney, connecting them with the city's broader rail network.
  • E. Brisbane–Ipswich transport corridor
    The Brisbane–Ipswich transport corridor is a major road and rail route in South East Queensland that links the city of Brisbane with the regional city of Ipswich and surrounding growth areas.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Hobart northern transport corridor
Target entity description: The Hobart northern transport corridor is a major arterial route in Hobart, Tasmania, carrying traffic between the city and its northern suburbs and regions.
  • A. Adelaide north–south corridor
    The Adelaide north–south corridor is a major continuous transport route through metropolitan Adelaide, designed to streamline north–south traffic flow via a series of upgraded expressways and motorways.
  • B. Goulburn Valley transport corridor
    The Goulburn Valley transport corridor is a major freight and passenger route in regional Victoria, Australia, linking agricultural and regional centres to Melbourne and interstate markets via road and rail.
  • C. Albury–Wodonga bypass
    The Albury–Wodonga bypass is a major road project that diverts through-traffic around the twin cities of Albury and Wodonga to improve traffic flow and safety on the Hume Highway corridor.
  • D. Sydney south-western rail corridor
    The Sydney south-western rail corridor is a major suburban and intercity railway route serving the south-western suburbs of Sydney, connecting them with the city's broader rail network.
  • E. Brisbane–Ipswich transport corridor
    The Brisbane–Ipswich transport corridor is a major road and rail route in South East Queensland that links the city of Brisbane with the regional city of Ipswich and surrounding growth areas.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8dcfec90481909e926be9767e5779 completed April 10, 2026, 11:20 a.m.
NER Named-entity recognition batch_69e5d3e498308190bd1594cca841199c completed April 20, 2026, 7:21 a.m.
Created at: April 10, 2026, 11:59 a.m.