Triple

T18931799
Position Surface form Disambiguated ID Type / Status
Subject Ord River E463128 entity
Predicate hasDam P8736 FINISHED
Object Kununurra Diversion Dam NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Kununurra Diversion Dam | Statement: [Ord River, hasDam, Kununurra Diversion Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Kununurra Diversion Dam
Context triple: [Ord River, hasDam, Kununurra Diversion Dam]
  • A. Moondarra Dam
    Moondarra Dam is a major water storage and irrigation structure in Queensland, Australia, built to supply water to the nearby city of Mount Isa and its mining operations.
  • B. Talbingo Dam
    Talbingo Dam is a major rockfill embankment dam in New South Wales, Australia, forming part of the Snowy Mountains Scheme and creating Talbingo Reservoir for hydroelectric power generation and water storage.
  • C. Ross River Dam
    Ross River Dam is a major water storage and flood mitigation structure near Townsville in Queensland, Australia, supplying drinking water and helping protect the region from flooding.
  • D. Hume Dam
    Hume Dam is a major concrete gravity dam in southeastern Australia that forms Lake Hume and plays a key role in water storage, irrigation, and flood control in the Murray–Darling Basin.
  • E. O’Sullivan Dam
    O’Sullivan Dam is a major earth-fill dam in central Washington State that forms Potholes Reservoir and plays a key role in irrigation and water management for the Columbia Basin Project.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Kununurra Diversion Dam
Target entity description: Kununurra Diversion Dam is a major irrigation and water-control structure on Western Australia’s Ord River that helps form Lake Kununurra and supports the Ord River Irrigation Scheme.
  • A. Moondarra Dam
    Moondarra Dam is a major water storage and irrigation structure in Queensland, Australia, built to supply water to the nearby city of Mount Isa and its mining operations.
  • B. Talbingo Dam
    Talbingo Dam is a major rockfill embankment dam in New South Wales, Australia, forming part of the Snowy Mountains Scheme and creating Talbingo Reservoir for hydroelectric power generation and water storage.
  • C. Ross River Dam
    Ross River Dam is a major water storage and flood mitigation structure near Townsville in Queensland, Australia, supplying drinking water and helping protect the region from flooding.
  • D. Hume Dam
    Hume Dam is a major concrete gravity dam in southeastern Australia that forms Lake Hume and plays a key role in water storage, irrigation, and flood control in the Murray–Darling Basin.
  • E. O’Sullivan Dam
    O’Sullivan Dam is a major earth-fill dam in central Washington State that forms Potholes Reservoir and plays a key role in irrigation and water management for the Columbia Basin Project.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8dcfdbbb881909964fa5a75bd0b48 completed April 10, 2026, 11:20 a.m.
NER Named-entity recognition batch_69e5c9c0b84881909ad6da9522203df8 completed April 20, 2026, 6:37 a.m.
Created at: April 10, 2026, 11:59 a.m.