Triple

T18929747
Position Surface form Disambiguated ID Type / Status
Subject Lucerne Festival Orchestra Mahler cycle E463070 entity
Predicate instanceOf P0 FINISHED
Object Mahler symphony cycle C41348 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Mahler symphony cycle
Context triple: [Lucerne Festival Orchestra Mahler cycle, instanceOf, Mahler symphony cycle]
  • A. Lieder cycle
    A Lieder cycle is a curated collection of art songs, typically by a single composer, designed to be performed as a unified whole through shared poetic themes, narrative, or musical motifs.
  • B. cantata cycle
    A cantata cycle is a series of related cantatas, often unified by a liturgical, textual, or thematic framework, intended to be performed over a specific period such as a church year.
  • C. piano cycle
    A piano cycle is a collection of piano pieces conceived as a unified whole, often linked by a common theme, key scheme, or narrative idea, and intended to be performed in sequence.
  • D. sinfonia
    A sinfonia is a short orchestral or instrumental composition, often serving as an introduction or interlude in larger vocal or theatrical works, characterized by its concise, expressive musical development.
  • E. New York Philharmonic initiative
    A New York Philharmonic initiative is a program or project undertaken by the orchestra to advance its artistic, educational, community, or institutional goals.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8dcfdbbb881909964fa5a75bd0b48 completed April 10, 2026, 11:20 a.m.
Created at: April 10, 2026, 11:59 a.m.