Triple

T18915934
Position Surface form Disambiguated ID Type / Status
Subject London Wall (road) E462723 entity
Predicate hasBuildingAlong P107740 FINISHED
Object London Wall Place development NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: London Wall Place development | Statement: [London Wall (road), hasBuildingAlong, London Wall Place development]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: London Wall Place development
Context triple: [London Wall (road), hasBuildingAlong, London Wall Place development]
  • A. Lanyon Place development
    Lanyon Place development is a major urban regeneration project in Belfast that includes commercial, residential, and transport infrastructure centered around the Lanyon Place area.
  • B. London Bridge Quarter development site
    The London Bridge Quarter development site is a major mixed-use redevelopment area in central London centered around The Shard and adjacent transport and commercial facilities.
  • C. Fitzroy Place development
    Fitzroy Place development is a mixed-use complex in central London featuring residential, office, and retail spaces built on the former site of Middlesex Hospital.
  • D. Crossrail Place
    Crossrail Place is a distinctive mixed-use development and rooftop garden complex built above the Crossrail (Elizabeth line) station at Canary Wharf in London.
  • E. Barbican Estate
    Barbican Estate is a prominent post-war Brutalist residential and cultural complex in central London, known for its distinctive architecture and the Barbican Centre arts venue.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: London Wall Place development
Target entity description: London Wall Place development is a modern office and mixed-use complex in the City of London that integrates contemporary architecture with historic remains and elevated public walkways.
  • A. Lanyon Place development
    Lanyon Place development is a major urban regeneration project in Belfast that includes commercial, residential, and transport infrastructure centered around the Lanyon Place area.
  • B. London Bridge Quarter development site
    The London Bridge Quarter development site is a major mixed-use redevelopment area in central London centered around The Shard and adjacent transport and commercial facilities.
  • C. Fitzroy Place development
    Fitzroy Place development is a mixed-use complex in central London featuring residential, office, and retail spaces built on the former site of Middlesex Hospital.
  • D. Crossrail Place
    Crossrail Place is a distinctive mixed-use development and rooftop garden complex built above the Crossrail (Elizabeth line) station at Canary Wharf in London.
  • E. Barbican Estate
    Barbican Estate is a prominent post-war Brutalist residential and cultural complex in central London, known for its distinctive architecture and the Barbican Centre arts venue.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8dcfdbbb881909964fa5a75bd0b48 completed April 10, 2026, 11:20 a.m.
NER Named-entity recognition batch_69e5c62685408190b17280147e1c247a completed April 20, 2026, 6:22 a.m.
Created at: April 10, 2026, 11:58 a.m.