Triple
T18895181
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Oels |
E462193
|
entity |
| Predicate | hasRoadConnectionTo |
P11435
|
FINISHED |
| Object | Expressway S8 (Poland) |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Expressway S8 (Poland) | Statement: [Oels, hasRoadConnectionTo, Expressway S8 (Poland)]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Expressway S8 (Poland) Context triple: [Oels, hasRoadConnectionTo, Expressway S8 (Poland)]
-
A.
Expressway S17 (Poland)
Expressway S17 in Poland is a major dual carriageway route in eastern Poland that connects Warsaw with Lublin and further southeast toward the Ukrainian border, serving as an important corridor for regional and international traffic.
-
B.
N8 highway
The N8 highway is a major Moroccan road that runs across the Middle Atlas region, linking key cities such as Azrou with other important urban and economic centers.
-
C.
A-41 motorway
The A-41 motorway is a Spanish highway that connects the city of Ciudad Real with other major routes in the Castilla-La Mancha region.
-
D.
A8 Wrocław Motorway Bypass
The A8 Wrocław Motorway Bypass is a major ring-road section of Poland’s A8 motorway that diverts transit traffic around the city of Wrocław to improve flow and reduce congestion in the urban area.
-
E.
Polish expressway network
The Polish expressway network is a nationwide system of high-speed, limited-access roads that complements the country’s motorways by connecting major cities, regions, and international routes.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Expressway S8 (Poland) Target entity description: Expressway S8 in Poland is a major controlled-access highway that forms part of the national expressway network, connecting key cities including Wrocław, Łódź, Warsaw, and Białystok.
-
A.
Expressway S17 (Poland)
Expressway S17 in Poland is a major dual carriageway route in eastern Poland that connects Warsaw with Lublin and further southeast toward the Ukrainian border, serving as an important corridor for regional and international traffic.
-
B.
N8 highway
The N8 highway is a major Moroccan road that runs across the Middle Atlas region, linking key cities such as Azrou with other important urban and economic centers.
-
C.
A-41 motorway
The A-41 motorway is a Spanish highway that connects the city of Ciudad Real with other major routes in the Castilla-La Mancha region.
-
D.
A8 Wrocław Motorway Bypass
The A8 Wrocław Motorway Bypass is a major ring-road section of Poland’s A8 motorway that diverts transit traffic around the city of Wrocław to improve flow and reduce congestion in the urban area.
-
E.
Polish expressway network
The Polish expressway network is a nationwide system of high-speed, limited-access roads that complements the country’s motorways by connecting major cities, regions, and international routes.
- F. None of above. chosen
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8dcfd05bc819088903cca13cc2846 |
completed | April 10, 2026, 11:20 a.m. |
| NER | Named-entity recognition | batch_69e5c47eb0688190882c68d0d6fa9348 |
completed | April 20, 2026, 6:15 a.m. |
Created at: April 10, 2026, 11:58 a.m.