Triple
T18893557
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Kráľová dam |
E462152
|
entity |
| Predicate | hasPart |
P35
|
FINISHED |
| Object | Kráľová Hydroelectric Power Plant |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Kráľová Hydroelectric Power Plant | Statement: [Kráľová dam, hasPart, Kráľová Hydroelectric Power Plant]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Kráľová Hydroelectric Power Plant Context triple: [Kráľová dam, hasPart, Kráľová Hydroelectric Power Plant]
-
A.
Rjukan Hydroelectric Power Station
Rjukan Hydroelectric Power Station is a historic Norwegian hydroelectric facility central to early 20th-century industrial development and recognized as part of a UNESCO World Heritage industrial landscape.
-
B.
Kurpsai Hydroelectric Power Plant
Kurpsai Hydroelectric Power Plant is a major hydroelectric facility in Kyrgyzstan that generates electricity by harnessing the flow of the Naryn River.
-
C.
Sima Hydroelectric Power Station
The Sima Hydroelectric Power Station is a major Norwegian underground hydroelectric facility known for harnessing the waters of the Hardanger region to generate significant renewable energy.
-
D.
Lotru-Ciunget Hydropower Plant
The Lotru-Ciunget Hydropower Plant is a major Romanian hydroelectric facility that harnesses the Lotru River to generate electricity for the national grid.
-
E.
Fierza Hydroelectric Power Station
Fierza Hydroelectric Power Station is a major hydroelectric facility in northern Albania, forming part of the Drin River cascade and serving as one of the country’s largest sources of electricity.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Kráľová Hydroelectric Power Plant Target entity description: Kráľová Hydroelectric Power Plant is a hydroelectric facility in Slovakia that generates electricity using water impounded by the Kráľová dam on the Váh River.
-
A.
Rjukan Hydroelectric Power Station
Rjukan Hydroelectric Power Station is a historic Norwegian hydroelectric facility central to early 20th-century industrial development and recognized as part of a UNESCO World Heritage industrial landscape.
-
B.
Kurpsai Hydroelectric Power Plant
Kurpsai Hydroelectric Power Plant is a major hydroelectric facility in Kyrgyzstan that generates electricity by harnessing the flow of the Naryn River.
-
C.
Sima Hydroelectric Power Station
The Sima Hydroelectric Power Station is a major Norwegian underground hydroelectric facility known for harnessing the waters of the Hardanger region to generate significant renewable energy.
-
D.
Lotru-Ciunget Hydropower Plant
The Lotru-Ciunget Hydropower Plant is a major Romanian hydroelectric facility that harnesses the Lotru River to generate electricity for the national grid.
-
E.
Fierza Hydroelectric Power Station
Fierza Hydroelectric Power Station is a major hydroelectric facility in northern Albania, forming part of the Drin River cascade and serving as one of the country’s largest sources of electricity.
- F. None of above. chosen
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8dcfd05bc819088903cca13cc2846 |
completed | April 10, 2026, 11:20 a.m. |
| NER | Named-entity recognition | batch_69e5c47d392c81909297211c7d7610a1 |
completed | April 20, 2026, 6:15 a.m. |
Created at: April 10, 2026, 11:58 a.m.