Triple

T18893557
Position Surface form Disambiguated ID Type / Status
Subject Kráľová dam E462152 entity
Predicate hasPart P35 FINISHED
Object Kráľová Hydroelectric Power Plant NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Kráľová Hydroelectric Power Plant | Statement: [Kráľová dam, hasPart, Kráľová Hydroelectric Power Plant]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Kráľová Hydroelectric Power Plant
Context triple: [Kráľová dam, hasPart, Kráľová Hydroelectric Power Plant]
  • A. Rjukan Hydroelectric Power Station
    Rjukan Hydroelectric Power Station is a historic Norwegian hydroelectric facility central to early 20th-century industrial development and recognized as part of a UNESCO World Heritage industrial landscape.
  • B. Kurpsai Hydroelectric Power Plant
    Kurpsai Hydroelectric Power Plant is a major hydroelectric facility in Kyrgyzstan that generates electricity by harnessing the flow of the Naryn River.
  • C. Sima Hydroelectric Power Station
    The Sima Hydroelectric Power Station is a major Norwegian underground hydroelectric facility known for harnessing the waters of the Hardanger region to generate significant renewable energy.
  • D. Lotru-Ciunget Hydropower Plant
    The Lotru-Ciunget Hydropower Plant is a major Romanian hydroelectric facility that harnesses the Lotru River to generate electricity for the national grid.
  • E. Fierza Hydroelectric Power Station
    Fierza Hydroelectric Power Station is a major hydroelectric facility in northern Albania, forming part of the Drin River cascade and serving as one of the country’s largest sources of electricity.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Kráľová Hydroelectric Power Plant
Target entity description: Kráľová Hydroelectric Power Plant is a hydroelectric facility in Slovakia that generates electricity using water impounded by the Kráľová dam on the Váh River.
  • A. Rjukan Hydroelectric Power Station
    Rjukan Hydroelectric Power Station is a historic Norwegian hydroelectric facility central to early 20th-century industrial development and recognized as part of a UNESCO World Heritage industrial landscape.
  • B. Kurpsai Hydroelectric Power Plant
    Kurpsai Hydroelectric Power Plant is a major hydroelectric facility in Kyrgyzstan that generates electricity by harnessing the flow of the Naryn River.
  • C. Sima Hydroelectric Power Station
    The Sima Hydroelectric Power Station is a major Norwegian underground hydroelectric facility known for harnessing the waters of the Hardanger region to generate significant renewable energy.
  • D. Lotru-Ciunget Hydropower Plant
    The Lotru-Ciunget Hydropower Plant is a major Romanian hydroelectric facility that harnesses the Lotru River to generate electricity for the national grid.
  • E. Fierza Hydroelectric Power Station
    Fierza Hydroelectric Power Station is a major hydroelectric facility in northern Albania, forming part of the Drin River cascade and serving as one of the country’s largest sources of electricity.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8dcfd05bc819088903cca13cc2846 completed April 10, 2026, 11:20 a.m.
NER Named-entity recognition batch_69e5c47d392c81909297211c7d7610a1 completed April 20, 2026, 6:15 a.m.
Created at: April 10, 2026, 11:58 a.m.