Triple

T18891762
Position Surface form Disambiguated ID Type / Status
Subject SRS L Reactor E462106 entity
Predicate neighboringReactor P58637 FINISHED
Object SRS R Reactor NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: SRS R Reactor | Statement: [SRS L Reactor, neighboringReactor, SRS R Reactor]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: SRS R Reactor
Context triple: [SRS L Reactor, neighboringReactor, SRS R Reactor]
  • A. SRS L Reactor
    SRS L Reactor is a former production nuclear reactor at the Savannah River Site in South Carolina that was used primarily for generating materials for nuclear weapons.
  • B. SRS P Reactor
    SRS P Reactor is a former plutonium production nuclear reactor at the Savannah River Site in South Carolina, historically used to support the U.S. nuclear weapons program.
  • C. K Reactor
    K Reactor is a decommissioned nuclear production reactor at the Savannah River Site in South Carolina that was used primarily for producing weapons-grade materials during the Cold War.
  • D. G3 reactor
    The G3 reactor is a historic French nuclear reactor at the CEA Marcoule site, notable for its role in early plutonium production and nuclear research.
  • E. S2W nuclear reactor
    The S2W nuclear reactor was an early U.S. Navy pressurized water reactor design that powered the world’s first operational nuclear-powered submarine, USS Nautilus.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: SRS R Reactor
Target entity description: SRS R Reactor is one of the production nuclear reactors at the Savannah River Site in South Carolina, historically used for generating materials for the U.S. nuclear weapons program.
  • A. SRS L Reactor
    SRS L Reactor is a former production nuclear reactor at the Savannah River Site in South Carolina that was used primarily for generating materials for nuclear weapons.
  • B. SRS P Reactor
    SRS P Reactor is a former plutonium production nuclear reactor at the Savannah River Site in South Carolina, historically used to support the U.S. nuclear weapons program.
  • C. K Reactor
    K Reactor is a decommissioned nuclear production reactor at the Savannah River Site in South Carolina that was used primarily for producing weapons-grade materials during the Cold War.
  • D. G3 reactor
    The G3 reactor is a historic French nuclear reactor at the CEA Marcoule site, notable for its role in early plutonium production and nuclear research.
  • E. S2W nuclear reactor
    The S2W nuclear reactor was an early U.S. Navy pressurized water reactor design that powered the world’s first operational nuclear-powered submarine, USS Nautilus.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8dcfc3430819095ee6fc0eb4c06a5 completed April 10, 2026, 11:20 a.m.
NER Named-entity recognition batch_69e5c47bbf908190b141e98e3468e908 completed April 20, 2026, 6:15 a.m.
Created at: April 10, 2026, 11:58 a.m.