Triple
T18874117
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | 1997 Agreement |
E461640
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | road safety instrument |
C18225
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: road safety instrument Context triple: [1997 Agreement, instanceOf, road safety instrument]
-
A.
road safety program
A road safety program is an organized set of policies, education, engineering measures, and enforcement activities designed to prevent traffic accidents and reduce injuries and fatalities on roadways.
-
B.
roadway safety guideline
chosen
A roadway safety guideline is a documented set of principles, rules, and recommended practices designed to minimize traffic-related risks and enhance the safety of all road users.
-
C.
public safety system
A public safety system is an integrated framework of technologies, policies, and coordinated services designed to prevent, detect, respond to, and recover from threats or emergencies affecting the well-being of a community.
-
D.
safety
Safety is the condition in which people, systems, or environments are protected from harm, risk, or danger through preventive measures and controls.
-
E.
safety performance measure
A safety performance measure is a quantifiable indicator used to assess, monitor, and compare the effectiveness of safety-related activities, systems, or policies in reducing risk and preventing harm.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8dcfc3430819095ee6fc0eb4c06a5 |
completed | April 10, 2026, 11:20 a.m. |
Created at: April 10, 2026, 11:57 a.m.