Triple

T18862741
Position Surface form Disambiguated ID Type / Status
Subject Underfall Yard E461355 entity
Predicate instanceOf P0 FINISHED
Object working dock C28212 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: working dock
Context triple: [Underfall Yard, instanceOf, working dock]
  • A. dry dock
    A dry dock is a narrow basin or vessel that can be flooded to allow a ship to be floated in, then drained to expose the hull for construction, maintenance, or repair.
  • B. ore dock
    An ore dock is a specialized waterfront structure used for the storage, handling, and loading of bulk ore from rail or conveyor systems onto ships for transport.
  • C. wet dock chosen
    A wet dock is an enclosed, water-filled harbor basin where ships can be moored, loaded, and unloaded while maintaining a constant water level independent of tides.
  • D. public dock
    A public dock is a shared waterfront structure that provides open access for boats and pedestrians to moor, load, unload, and enjoy the surrounding waterway.
  • E. docking facility
    A docking facility is a designated structure or area where vehicles, vessels, or spacecraft securely attach for loading, unloading, maintenance, or passenger transfer.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8dcfb7b9c8190854e7b171b98ea2e completed April 10, 2026, 11:20 a.m.
Created at: April 10, 2026, 11:57 a.m.