Triple
T18849247
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | EDP – Energias de Portugal |
E460996
|
entity |
| Predicate | hasSubsidiary |
P254
|
FINISHED |
| Object | EDP Renováveis |
—
|
NE NERFINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: EDP Renováveis | Statement: [EDP – Energias de Portugal, hasSubsidiary, EDP Renováveis]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: EDP Renováveis Context triple: [EDP – Energias de Portugal, hasSubsidiary, EDP Renováveis]
-
A.
EDP – Energias de Portugal
EDP – Energias de Portugal is a major Portuguese multinational energy company focused on electricity generation, distribution, and renewable energy.
-
B.
EDP Renewables
chosen
EDP Renewables is a global renewable energy company focused primarily on developing, constructing, and operating wind and solar power projects.
-
C.
Tractebel Energia
Tractebel Energia is a Brazilian electric power generation company known for operating large hydroelectric facilities and other energy assets across the country.
-
D.
Iberdrola
Iberdrola is a major Spanish multinational electric utility company and one of the world’s largest producers of wind and renewable energy.
-
E.
Enel X
Enel X is a global energy solutions company specializing in advanced smart grids, electric mobility, and innovative charging technologies for electric vehicles and sustainable transport.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8dcfa11e4819090ab1ef5bdcd2b2e |
completed | April 10, 2026, 11:20 a.m. |
| NER | Named-entity recognition | batch_69e5b8f1abdc819081638ed384da191e |
completed | April 20, 2026, 5:26 a.m. |
Created at: April 10, 2026, 11:56 a.m.