Triple
T18848111
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Transtejo & Soflusa |
E460969
|
entity |
| Predicate | usesTerminal |
P24773
|
FINISHED |
| Object | Seixal ferry terminal |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Seixal ferry terminal | Statement: [Transtejo & Soflusa, usesTerminal, Seixal ferry terminal]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Seixal ferry terminal Context triple: [Transtejo & Soflusa, usesTerminal, Seixal ferry terminal]
-
A.
Cacilhas ferry terminal
Cacilhas ferry terminal is a major passenger ferry hub on the south bank of the Tagus River in Almada, Portugal, providing frequent connections to Lisbon.
-
B.
Port of Leixões
The Port of Leixões is one of Portugal’s main seaports, serving the Porto metropolitan area as a major hub for cargo, cruise traffic, and maritime logistics on the Atlantic coast.
-
C.
Port of Figueira da Foz
The Port of Figueira da Foz is a Portuguese Atlantic seaport serving the city of Figueira da Foz, known for regional cargo handling, fishing activities, and supporting local industry and trade.
-
D.
Port of Vila Franca do Campo
The Port of Vila Franca do Campo is a small maritime harbor on São Miguel Island in the Azores, serving local fishing, recreational boating, and regional maritime transport.
-
E.
Port of Horta
Port of Horta is a major Atlantic yachting and commercial harbor on Faial Island in the Azores, renowned as a key stopover for transoceanic sailors.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Seixal ferry terminal Target entity description: Seixal ferry terminal is a passenger ferry hub on Portugal’s Tagus River that connects the town of Seixal with Lisbon via regular Transtejo & Soflusa services.
-
A.
Cacilhas ferry terminal
Cacilhas ferry terminal is a major passenger ferry hub on the south bank of the Tagus River in Almada, Portugal, providing frequent connections to Lisbon.
-
B.
Port of Leixões
The Port of Leixões is one of Portugal’s main seaports, serving the Porto metropolitan area as a major hub for cargo, cruise traffic, and maritime logistics on the Atlantic coast.
-
C.
Port of Figueira da Foz
The Port of Figueira da Foz is a Portuguese Atlantic seaport serving the city of Figueira da Foz, known for regional cargo handling, fishing activities, and supporting local industry and trade.
-
D.
Port of Vila Franca do Campo
The Port of Vila Franca do Campo is a small maritime harbor on São Miguel Island in the Azores, serving local fishing, recreational boating, and regional maritime transport.
-
E.
Port of Horta
Port of Horta is a major Atlantic yachting and commercial harbor on Faial Island in the Azores, renowned as a key stopover for transoceanic sailors.
- F. None of above. chosen
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8dcfa11e4819090ab1ef5bdcd2b2e |
completed | April 10, 2026, 11:20 a.m. |
| NER | Named-entity recognition | batch_69e5b8f079b881908759135c5e2619ee |
completed | April 20, 2026, 5:26 a.m. |
Created at: April 10, 2026, 11:56 a.m.