Triple

T18842232
Position Surface form Disambiguated ID Type / Status
Subject Chamaeleon E460824 entity
Predicate culminationMonth P133133 FINISHED
Object April LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: April | Statement: [Chamaeleon, culminationMonth, April]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: culminationMonth
Context triple: [Chamaeleon, culminationMonth, April]
  • A. monthOfEnd
    Indicates the calendar month in which an event, period, or interval ends.
  • B. announcedInMonth
    Indicates that an announcement or declaration occurred during a specified calendar month.
  • C. climaxDateInYear
    Indicates the specific date within a given year on which something (such as an event, process, or phenomenon) reaches its peak or climax.
  • D. seasonCulminatesIn
    Indicates that a particular season reaches its peak, conclusion, or defining outcome in the specified event or state.
  • E. monthObserved
    Indicates the month during which an event, observation, or measurement took place.
  • F. None of above. chosen

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8dcfa11e4819090ab1ef5bdcd2b2e completed April 10, 2026, 11:20 a.m.
NER Named-entity recognition batch_69e5b8eb32548190b2313e877f6ff179 completed April 20, 2026, 5:26 a.m.
PD Predicate disambiguation batch_69e48d1e7dac81909ea1e758c87773c5 completed April 19, 2026, 8:06 a.m.
PDg Predicate description generation batch_69e49785fd7081909577e90a55df0a35 completed April 19, 2026, 8:51 a.m.
Created at: April 10, 2026, 11:56 a.m.