Triple
T18841269
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Lycus River (Pontus) |
E460801
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | river of Pontus |
C79
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: river of Pontus Context triple: [Lycus River (Pontus), instanceOf, river of Pontus]
-
A.
river
chosen
A river is a natural flowing body of water, usually freshwater, that moves continuously along a defined channel from higher elevations toward lower ones, often emptying into a sea, lake, or another river.
-
B.
distributary of the Nile
A distributary of the Nile is a branch of the river that diverges from the main channel in its delta region, carrying water and sediment toward the Mediterranean Sea.
-
C.
Parva
Parva is a conceptual class representing small, subtle, or foundational entities whose collective interactions give rise to larger, emergent structures or behaviors.
-
D.
Lavra
A lavra is a type of Eastern Christian monastic settlement consisting of a cluster of hermit dwellings centered around a common church and occasionally shared facilities, allowing monks to live semi-eremitical lives within a loose communal structure.
-
E.
Asynja
Asynja is a conceptual class representing a powerful, often divine, female figure associated with strength, wisdom, and protective authority, inspired by Norse mythology’s goddesses.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8dcfa11e4819090ab1ef5bdcd2b2e |
completed | April 10, 2026, 11:20 a.m. |
Created at: April 10, 2026, 11:56 a.m.