Triple
T18823461
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Santa Mesa |
E460322
|
entity |
| Predicate | hasTransport |
P1298
|
FINISHED |
| Object | LRT Line 2 |
—
|
NE NERFINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: LRT Line 2 | Statement: [Santa Mesa, hasTransport, LRT Line 2]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: LRT Line 2 Context triple: [Santa Mesa, hasTransport, LRT Line 2]
-
A.
LRT Line 2
chosen
LRT Line 2 is an elevated rapid transit line in Metro Manila, Philippines, running east–west and serving major areas including Quezon City, Manila, and Pasig.
-
B.
LRT Line 1
LRT Line 1 is a major elevated urban rail line in Metro Manila, Philippines, forming part of the city’s light rail transit system and serving as a key north–south transport corridor.
-
C.
Metro Line 2
Metro Line 2 is one of the main lines of the Mexico City Metro system, running north–south through key residential and commercial areas and serving as a major transit corridor for daily commuters.
-
D.
MRT Light Red Line
The MRT Light Red Line is a commuter rail line in Bangkok’s Mass Rapid Transit network serving suburban areas to the north and west of the city.
-
E.
MRT Line 7
MRT Line 7 is a rapid transit line under development in Metro Manila, Philippines, intended to connect Quezon City with the city of San Jose del Monte in Bulacan.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8dcf94c288190a06dea029ae4b223 |
completed | April 10, 2026, 11:20 a.m. |
| NER | Named-entity recognition | batch_69e5a6bce5588190bd0aefcd0c51edad |
completed | April 20, 2026, 4:08 a.m. |
Created at: April 10, 2026, 11:55 a.m.