Triple

T18823259
Position Surface form Disambiguated ID Type / Status
Subject Cornelis Lely E460318 entity
Predicate instanceOf P0 FINISHED
Object Dutch civil engineer C41276 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Dutch civil engineer
Context triple: [Cornelis Lely, instanceOf, Dutch civil engineer]
  • A. Belgian architect
    A Belgian architect is a professional designer from Belgium who plans and oversees the construction or renovation of buildings and structures, integrating functionality, aesthetics, and local cultural and regulatory contexts.
  • B. Dutch Classicist architect
    A Dutch Classicist architect is a designer of buildings in the Netherlands who applies the principles of classical architecture—such as symmetry, proportion, and the use of classical orders—often adapted to local materials, traditions, and urban contexts.
  • C. Panama Canal engineer
    A Panama Canal engineer is a professional responsible for designing, maintaining, and optimizing the canal’s complex system of locks, channels, and supporting infrastructure to ensure safe and efficient maritime transit between the Atlantic and Pacific Oceans.
  • D. Polish architect
    A Polish architect is a professional designer from Poland who plans, designs, and oversees the construction or renovation of buildings and spaces, often integrating Polish cultural, historical, and environmental contexts into their work.
  • E. Portuguese engineer
    A Portuguese engineer is a professional from Portugal who applies scientific, mathematical, and technical knowledge to design, develop, and optimize systems, structures, or technologies across various engineering fields.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8dcf94c288190a06dea029ae4b223 completed April 10, 2026, 11:20 a.m.
Created at: April 10, 2026, 11:55 a.m.