Triple

T1881792
Position Surface form Disambiguated ID Type / Status
Subject Fairfax County Parkway E39866 entity
Predicate alsoKnownAs P39 FINISHED
Object SR 286
SR 286 is a major north–south arterial highway in Fairfax County, Virginia, commonly known as the Fairfax County Parkway.
E209802 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: SR 286 | Statement: [Fairfax County Parkway, alsoKnownAs, SR 286]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: SR 286
Context triple: [Fairfax County Parkway, alsoKnownAs, SR 286]
  • A. SR 18
    SR 18 is a state highway in Georgia that runs east–west across the central part of the state, connecting several small towns and regional routes.
  • B. SR 21
    SR 21 is a primary state highway in Alabama that runs north–south across the state, connecting several major towns and highways.
  • C. SR 316
    SR 316 is a major east–west state highway in Georgia that connects the Atlanta metropolitan area with the city of Athens.
  • D. SR 54
    SR 54 is a state highway in Georgia that connects several communities in the western part of the state, including areas around Atlanta.
  • E. SR 143
    SR 143 is a short Arizona state highway in the Phoenix metropolitan area that primarily serves as a connector between Interstate 10 and Phoenix Sky Harbor International Airport.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: SR 286
Triple: [Fairfax County Parkway, alsoKnownAs, SR 286]
Generated description
SR 286 is a major north–south arterial highway in Fairfax County, Virginia, commonly known as the Fairfax County Parkway.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: SR 286
Target entity description: SR 286 is a major north–south arterial highway in Fairfax County, Virginia, commonly known as the Fairfax County Parkway.
  • A. SR 18
    SR 18 is a state highway in Georgia that runs east–west across the central part of the state, connecting several small towns and regional routes.
  • B. SR 21
    SR 21 is a primary state highway in Alabama that runs north–south across the state, connecting several major towns and highways.
  • C. SR 316
    SR 316 is a major east–west state highway in Georgia that connects the Atlanta metropolitan area with the city of Athens.
  • D. SR 54
    SR 54 is a state highway in Georgia that connects several communities in the western part of the state, including areas around Atlanta.
  • E. SR 143
    SR 143 is a short Arizona state highway in the Phoenix metropolitan area that primarily serves as a connector between Interstate 10 and Phoenix Sky Harbor International Airport.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a88633e4fc8190b7eb40463e048ec5 completed March 4, 2026, 7:21 p.m.
NER Named-entity recognition batch_69abb0fb95b48190af5286662c8b9734 completed March 7, 2026, 5 a.m.
NED1 Entity disambiguation (via context triple) batch_69addf5eabd8819089f267db92993033 completed March 8, 2026, 8:43 p.m.
NEDg Description generation batch_69addfe604708190b85d6f7261197537 completed March 8, 2026, 8:45 p.m.
NED2 Entity disambiguation (via description) batch_69ade0919d748190a4326d4abca2c9eb completed March 8, 2026, 8:48 p.m.
Created at: March 4, 2026, 7:34 p.m.