Triple

T1881756
Position Surface form Disambiguated ID Type / Status
Subject Fairfax County Parkway E39866 entity
Predicate instanceOf P0 FINISHED
Object north–south arterial road C7513 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: north–south arterial road
Context triple: [Fairfax County Parkway, instanceOf, north–south arterial road]
  • A. north–south highway
    A north–south highway is a major roadway that primarily runs in a longitudinal direction, connecting regions or cities along a north-to-south axis.
  • B. arterial roadway chosen
    An arterial roadway is a high-capacity urban or suburban street designed to efficiently carry large volumes of through traffic between local streets and highways while providing limited direct property access.
  • C. urban arterial road
    An urban arterial road is a high-capacity city street designed to carry large volumes of traffic efficiently between local streets and major highways while providing controlled access to adjacent land uses.
  • D. road transportation corridor
    A road transportation corridor is a designated linear area of land that accommodates one or more roadways and associated infrastructure to enable the efficient movement of vehicles, goods, and people between key origins and destinations.
  • E. avenue
    An avenue is a broad, often tree-lined street or thoroughfare designed to accommodate significant vehicular and pedestrian traffic within an urban or suburban area.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a88633e4fc8190b7eb40463e048ec5 completed March 4, 2026, 7:21 p.m.
Created at: March 4, 2026, 7:34 p.m.